
INDUSTRIAL
Aphroditi - Maritime Systems Installation and Electrical Modifications
The primary objective of this project is to enhance the operational capabilities and safety features of the M/V Aphroditi through the installation of new maritime systems, including navigation and radar systems, along with modifications to the electrical system and the installation of a safety/fire detection system.
Andiamo - Electrical system re-fit, Fiber optic whole ship monitoring system installation,
Stabilizer system control system installation. The objective of the electrical system re-fit is to enhance and upgrade the existing electrical infrastructure on the vessel.
Belle - Stabilizer System Controller Replacement
The primary objective of this project is to replace the existing stabilizer system controller on the M/V Belle. The controller replacement aims to enhance the vessel’s stability, improve control mechanisms, and ensure the reliable operation of the stabilizer system.
Somerset - Electrical System Refit and Generator Installation
The primary objective of this project is to upgrade and modernize the electrical system on the M/V Somerset through a comprehensive refit. Additionally, the project includes the installation of new generators to enhance power generation capabilities and overall electrical performance.